Water and Dams Section
Introduction

Water and Dams Section is concerned about monitoring water resource and dams, Studies on development and conservation of water resources, controlling the consumption of groundwater from the wells, falajes and springs and studies on the surface water flow through the wadis. Studying suitable location for dams and breakers, Making specifications for drilling the observation wells as well as providing the required supervision .

Briefly the routine works executed are as follows

Dams

  1. Monitoring and operation works of ten major dams in UAE and some of the breakers .
  2. Specifying the required maintenance for the dams and quantity of silt to be removed from reservoir of the dams and preparing tender and contract documents with all specifications for such works .
  3. Following the procedures for tendering and awarding contracts for studies, investigations and designs of dams projects and evaluation of tendered offers .
  4. Supervision and follow up, reviewing and issuing consultants and contractors payments certificates for dams projects .

Groundwater

  1. Monitoring of 176 observation wells spread all over the UAE.
  2. Preparing specifications for observation wells as well as supervision.
  3. Supervision on investigation and development of groundwater resources .
  4. Licensing the drilling companies and issuing No Objection Certificates .
  5. Evaluation studies for groundwater resources .

Hydrology

  1. Monitoring surface water flow for 22 wadis .
  2. Monitoring surface flow for 50 falajes .
  3. Studies on wadi flows for dams, culverts to prevent flooding .
  4. Maintenance of water level recorders installed in the wadis and wells.
  5. Preparing yearly book for hydrology .

Dams Of Ministry Of Environment & Water

MOEW Constructs Dams in UAE to meet the increase in demand on water because of the Agricultural and economical developments in the country .

The main purposes of dams projects are as follows :

  1. To increase groundwater recharge .
  2. To improve water table and to stop seawater intrusion .
  3. To make use of surface water in irrigation .
  4. To conserve soil and farms from flooding .
  5. To limit damages and losses from flooding .
  6. To enhance soil characteristics for the farms by mixing it with dam's silted soil .
  7. To meet the demand on domestic water in agricultural regions.

The following salient features of the listed dams built by MOEW:

  • Ham Dam
  • Wurayyah Dam
  • Zikt Dam
  • Basseirah Dam
  • Bih Dam
  • Idhn Dam
  • Gulfa Dam
  • Tawiyaeen Dam
  • Hadf Dam

 Ham Dam

Wadi Ham is located in eastern agricultural region, the main objective of the project was to get benefit from surface water running to improve water table, stopping seawater intrusion, limiting damages and losses from flooding and enhance water quality.

Ham Dam Site
Dec 1982 Completion Date
Ground Water Recharge and Flood Protection Purpose of the Dam
211 m2 Catchment’s Area
7million Km3 Dam Capacity
1,600,000 m2 Reservoir Area
Earth fill Type of the Dam
16 m Height of the Dam
2800 m Length of the Dam
180 m Length of 2 Spillways
2,590 m3 /s Spillway Discharge Capacity

 Wurayyah Dam

Wadi Wurayyah is located in eastern agricultural region, running from Masafi Mountains towards Gulf of Oman and the dam is about 9 Km from the coast on the Khor Fakan - Dibba road .

The main objective of the project was to get benefit from surface water running to the sea .

The Main dam height is 33 m, 367m is the length and 5.2 MCM is the reservoir capacity, in addition there are two breakers the first one about 2 Km downstream of main dam having 4 m height, 150 m length and 140,000 m3 capacity and the second one on wadi Al Khun which is about 8 Km from main dam and 6 Km from the coast, it has 4 m height, 75 m length and 30,000 m3 capacity .

Wurayyah Dam Site
Dec 1997 Completion Date
Ground Water Recharge and Flood Protection Purpose of the Dam
113 m2 Catchment’s Area
5.2milion m3 Dam Capacity
490.000 m2 Reservoir Area
Earth - Rock fill Type of the Dam
33 m Height of the Dam
367 m Length of the Dam
150 m Length of Spillway
2,417 m3 /s Spillway Discharge Capacity

 Zikt Dam

Wadi Zikt is located in eastern agricultural region, about 8 Km from Gulf of Oman, in addition three breakers storing about 500,000 m3 are existing downstream of the dam for the purpose of slowing down the flow from spillway .

Zikt Dam Site
Dec. 1991 Completion Date
Ground Water Recharge and Flood Protection Purpose of the Dam
68 Km2 Catchment’s Area
3 million Km3 Dam Capacity
492,500 m2 Reservoir Area
Earth Rock fill Type of the Dam
18 m Height of the Dam
234 m Length of the Dam
150 m Length of Spillway
1,677 m3 /s Spillway Discharge Capacity

 Basseirah Dam

Wadi Basseirah is located in northern agricultural region, running from Masafi Mountains passes Dibba town towards Gulf of Oman.

Basseirah Dam Site
Jul. 1999 Completion Date
Ground Water Recharge and Flood Protection Purpose of the Dam
116 Km2 Catchment’s Area
1.6 million m3 Dam Capacity
350.000 m2 Reservoir Area
Earth- Rock fill Type of the Dam
8 m Height of the Dam
880 m Length of the Dam
800 m Length of Spillway
2.172 m3 /s Spillway Discharge Capacity
 

Bih Dam

Wadi Bih is located in northern agricultural region, the main objective of the project was to get benefit from surface water running to improve water table and to balance water consumption in the region .

Bih Dam Site
Oct. 1982 Completion Date
Ground Water Recharge and Flood Protection Purpose of the Dam
468 Km2 Catchment’s Area
7.5milion Km3 Dam Capacity
1,800,000 m2 Reservoir Area
Earth fill Type of the Dam
18 m Height of the Dam
575 m Length of the Dam
300 m Length of Spillway
2,650 m3 /s Spillway Discharge Capacity

 Idhn Dam

Wadi Idhn is located in northern agricultural region, the main objective of the project was to slow down the runoff and to improve water table downstream .

Idhn Dam Site
Oct. 1983 Completion Date
Ground Water Recharge and Flood Protection Purpose of the Dam
70,5 Km2 Catchment’s Area
500,000 m3 Dam Capacity
600,000 m2 Reservoir Area
Earth fill Type of the Dam
10 m Height of the Dam
113 m Length of the Dam
38m Length of Spillway
150 m3 /s Spillway Discharge Capacity

 Gulfa Dam

Wadi Gulfa is located in central agricultural region, the main objective of the project was to retard the runoff and to improve water table downstream .

Gulfa Dam Site
Mar. 1985 Completion Date
Ground Water Recharge and Flood Protection Purpose of the Dam
11.5 Km2 Catchment’s Area
300.000 m3 Dam Capacity
35,000 m2 Reservoir Area
Earth fill and concrete Type of the Dam
7.5 m Height of the Dam
210 m Length of the Dam
27m Length of Spillway
310 m3 /s Spillway Discharge Capacity

 Tawiyaeen Dam

Wadi Tawiyaeen is located in northern agricultural region near Tawiyaeen village, the main objective of the project was to slow down the runoff which spreads in the gravel plain and goes waste by evaporation .

Tawiyaeen Dam Site
April 1991 Completion Date
Ground Water Recharge and Flood Protection Purpose of the Dam
190 Km2 Catchment’s Area
18.5 million m3 Dam Capacity
3,240,000 m2 Reservoir Area
Earth Rock fill Type of the Dam
23.5 m Height of the Dam
342 m Length of the Dam
144 m Length of Spillway
2,665 m3 /s Spillway Discharge Capacity

 Hadf Dam

Wadi Hadf is located in central agricultural region, the main objective of the project was to get benefit from surface water running to improve water table downstream .

Hadf Dam Site
Oct. 1991 Completion Date
Ground Water Recharge and Flood Protection Purpose of the Dam
62 Km2 Catchment’s Area
3 million m3 Dam Capacity
675,000 m2 Reservoir Area
Earth fill Type of the Dam
11 m Height of the Dam
875 m Length of the Dam
577 m Length of Spillway
1,609 m3 /s Spillway Discharge Capacity

Volume Of Water Stored in Some Of The DAMS in UAE, Since their construction (in million cubic meters)